Projects

Projects & approach

ProjectsSelected projectsDocumented contribution

Project record

Built in
real conditions.

Aerial view of reclamation works at Makoko
01 / 11
Lagos Lagoon

Makoko Reclamation

Dredging, sand transportation, pumping, spreading and compaction for the ongoing CCECC Makoko reclamation.

Aerial view of the Orange Island reclamation area
02 / 11
Lagos

Orange Island

BIOYOQ was one of several dredging companies contributing to the wider reclamation of approximately 150 hectares.

Bridge piling works across a waterfront in Port Harcourt
03 / 11
Port Harcourt

Community Bridge

Bridge piling works supporting a vital community connection and improved local accessibility.

BIOYOQ boring reinforced-concrete piles for the Government Lodge in Porto-Novo
04 / 11
Porto-Novo, Benin Republic

Government Lodge

Pile boring, reinforcement-cage installation and preparation for concreting for a government residential lodge.

Trinity Tower construction in Victoria Island
05 / 11
Victoria Island, Lagos

Trinity Tower

Subcontractor pile-foundation works for a concrete high-rise of more than 12 floors and approximately 13,000 square metres.

Rigid-pavement runway construction at Abakaliki Airport
06 / 11
Ebonyi State

Abakaliki Airport Runway

Subcontractor contribution to rigid-pavement construction for the airport runway supporting regional air connectivity.

Flyover construction in Borno State
07 / 11
North-East Nigeria

Borno Flyover

A subcontractor role in the construction of a 1.5-kilometre flyover developed to improve connections between busy districts.

General Hospital development in Ebonyi State
08 / 11
Ebonyi State

General Hospital

Involvement in a hospital facility designed to expand cancer-care capacity and developed in line with LEED certification requirements.

Road construction works in Ebonyi State
09 / 11
Ebonyi State

Ebonyi Road Networks

Design and construction activity across access roads, the Afikpo highway corridor, regional networks and residential districts.

Civil construction at a greenfield steel plant
10 / 11
Ebonyi State

Greenfield Steel Plant

Civil works covering site clearing, earthworks, internal roads, a 50-metre pre-heater tower and associated structural steel.

Road development works in Enugu State
11 / 11
Enugu State

Enugu Road Development

Access-road and regional-network development serving central areas, the Nsukka highway corridor and residential districts.

DeliveryProject methodFrom condition to completion

How we work

Engineering is
a sequence.

01

Read the site

Survey the interface between water, soil, access and load.

02

Engineer the method

Define the sequence, equipment and controls before mobilisation.

03

Execute with precision

Coordinate people, plant and material around measurable outcomes.

04

Build for permanence

Deliver infrastructure designed for the forces it will face.